A clearer way to review project cost
The estimate presents measured work, scope notes and cost assumptions in a structure that can be reviewed alongside the project information. That gives the design team a practical cost reference for client discussions, revisions and tender preparation.
- Estimate reports, drawings and notes kept together
- Scope notes, exclusions, allowances and provisional sums kept visible
- Estimate sections laid out for design-team and client review
