Building Cost Calculator

Use this Building Cost Calculator UK guide to price typical home projects quickly, with clear assumptions, per m² rates, and example allowances you can copy into your brief.

For a standard single storey rear extension in England at Q4 2025, most homeowners budget £2,000 to £3,000 per m² incl VAT for a complete build, excluding design, surveys and abnormals.

Quick help: Ready to firm up a quote pack for your drawings? Request a Custom Estimate. If you are comparing tools, see Construction Estimating Software or start with Best Free Construction Estimating Software UK. Our Construction Calculators hub links to more trade-specific calculators.

Typical homeowner budgets at Q4 2025 are £2,000 to £3,000 per m² incl VAT for single storey extensions, £1,600 to £2,500 per m² incl VAT for two storey extensions, and £1,600 to £2,600 per m² incl VAT for loft conversions. Allow separate fees for design, surveys, planning and utilities. Region: UK (England). Base date: Q4 2025. VAT: Costs shown incl VAT at 20% unless noted. Some energy-saving measures may be zero rated; new build homes can be zero rated. Units: m², m, l/m, item, kWp. Currency: GBP.

This post is part of our homeowner pricing series. For estimating workflows and software, read Construction Estimating Software.

Cost Summary

Base date: Q4 2025. VAT: Incl 20% where applicable. These are typical build-only budgets for straightforward conditions. Complex design, constrained access or structural alterations increase cost.

  • Single storey extension: £2,000 to £3,000 per m² incl VAT
  • Two storey extension: £1,600 to £2,500 per m² incl VAT
  • Loft conversion (dormer): £1,600 to £2,600 per m² incl VAT
  • Garage conversion: £900 to £1,500 per m² incl VAT
  • Whole house refurbishment: £1,200 to £2,000 per m² incl VAT
  • New build house: £1,800 to £2,500 per m² incl VAT

Assumptions and Methodology

Rates are built up from labour, materials, preliminaries and overheads. We map elements to RICS NRM so your allowances line up with how estimators structure costs. Quantities assume measured gross internal area for m² items and centerline length for l/m items. Prices assume standard specification, accessible site, and no significant abnormals such as piling, contamination or major service diversions.

Where VAT treatment varies, we state notes in the table. New build dwellings can be zero rated. Some energy-saving materials can be zero rated for domestic installations. Always confirm VAT with your contractor and HMRC guidance.

Use this calculator guide to set a range, then request firm quotes. If you already have drawings and a scope, we can turn around a small residential estimate in 24 hours from complete information. Request a Custom Estimate.

Detailed Cost Breakdown

Copy these typical ranges into your brief. Add quantities for your project to estimate totals.

ScopeUnitLow £High £Typical £Base dateNotes
Single storey extension200030002400Q4 2025Incl VAT; basic kitchen not included
Two storey extension160025002100Q4 2025Incl VAT; higher efficiency at scale
Loft conversion (dormer)160026002100Q4 2025Incl VAT; assumes stair and dormer
Garage conversion90015001200Q4 2025Incl VAT; excludes structural surprises
Whole house refurbishment120020001600Q4 2025Incl VAT; excludes high-end finishes
New build house180025002150Q4 2025Zero rated VAT for qualifying new dwellings
Kitchen refurbishment (mid-range)item120003000018000Q4 2025Incl VAT; excludes appliances upgrades beyond mid
Bathroom refurbishmentitem5000150009500Q4 2025Incl VAT; full strip out and refit
Rewire 3 bed houseitem300060004500Q4 2025Incl VAT; plaster repairs allowed
Roof replacement (concrete tile)90160120Q4 2025Incl VAT; includes membrane and battens
uPVC double glazed windows350600475Q4 2025Incl VAT; measured as opening area
Internal door, supply and fititem150350240Q4 2025Incl VAT; prefinished standard sizes
Plaster skim to walls122016Q4 2025Incl VAT; assumes fair background
Painting walls6129Q4 2025Incl VAT; two coats emulsion
Underfloor heating (wet)7011090Q4 2025Incl VAT; floor build-up not included
Air source heat pump 8–12 kWitem90001600012000Q4 2025Incl VAT; grants may reduce net cost
Solar PVkWp120018001450Q4 2025Domestic installations may be zero rated
Driveway block paving90140110Q4 2025Incl VAT; includes sub base
Drainage new runl/m75150110Q4 2025Incl VAT; inspection chambers extra
Strip foundationsm95160125Q4 2025Incl VAT; depth dependent on soil
Structural steel beam installeditem6501200850Q4 2025Incl VAT; includes padstones and making good
Brickwork cavity wall120200160Q4 2025Incl VAT; includes ties and insulation
Roof insulation upgrade204030Q4 2025Incl VAT; mineral wool typical

Programme and Durations

  • Concept and design: 2 to 6 weeks depending on complexity.
  • Planning and approvals: 8 to 12 weeks if required. Permitted development can be quicker.
  • Tendering and quotes: 2 to 4 weeks. Allow time for site visits.
  • Build duration: 8 to 14 weeks for typical single storey extensions; lofts 6 to 10 weeks.
  • Fast-track estimating: For small residential scopes, we can return a costed estimate within 24 hours from complete information. Request a Custom Estimate.

Regional Variation

London and the South East often sit at the top of ranges due to labour and prelims. Northern regions can be closer to the lower bound. Islands and remote areas may incur travel and accommodation allowances. Material volatility and lead times affect all regions, so confirm current pricing with your contractor.

Inclusions and Exclusions

Included in ranges: Labour, materials, preliminaries, standard waste removal, and typical site set up for residential projects. Excluded: Design fees, surveys, planning fees, Party Wall matters, utilities upgrades, specialist finishes, major structural change unless stated, and abnormal ground conditions.

Risks and Allowances

  • Contingency: 10 to 15 percent for straightforward projects; 15 to 20 percent for complex or unknown structures.
  • Provisional sums: Keep sums for drainage, structural steel and kitchen/bathroom fit out if not finalised.
  • Inflation note: Allow for contract uplift on long programmes. Review supplier quotes within 30 days.
  • VAT: Domestic repair and renovation is usually standard rated. New build dwellings and certain energy-saving materials may be zero rated. Confirm treatment before contract.

Cost disclaimer: Ranges are indicative at Q4 2025 and depend on specification, access and market conditions. Always seek written quotes on a fixed scope.

FAQs

How do I calculate my extension cost per m²?

Measure the new internal floor area in m² and multiply by the relevant range above. Add a contingency, kitchen or bathroom allowances, and fees for design and approvals.

Are the costs inclusive of VAT?

Yes, figures include VAT at 20 percent unless noted. Some items may be zero rated by HMRC depending on scope.

What drives costs up the most?

Structural alterations, complex glazing, bespoke joinery, restricted access, and changes after ordering typically increase cost.

Do I need planning permission for an extension?

Many rear extensions fall under permitted development, but rules vary by property and local authority. Check early to avoid delays.

What is excluded from the per m² rates?

Design fees, surveys, planning fees, premium finishes, utilities upgrades and abnormals such as piling or contamination.

How accurate is a per m² allowance?

It is a budgeting tool. Accuracy improves when you have drawings, a defined specification and measured quantities.

Can I lower costs without compromising quality?

Keep the footprint simple, minimise structural changes, standardise openings, and lock specification before ordering.

When should I get a professional estimate?

Once you have drawings and a room-by-room scope. A professional estimate aligns with RICS NRM and helps you compare quotes fairly.

Sources

Key Facts & Assumptions (At a Glance)

  • Primary keyword: Building Cost Calculator UK
  • Audience: Homeowner
  • Region: UK (England)
  • VAT stance: Costs include VAT at 20 percent unless stated
  • Units: m², m, l/m, item, kWp
  • Method: RICS NRM style build up with typical UK labour, materials and prelims
  • How we calculated this: Normalised supplier and contractor ranges to Q4 2025 with standard specification and accessible site

Next step: Request a Custom Estimate for your drawings and scope.

Looking for a tailored estimate for your project, or interested in discussing your ideas further? Fill out our contact form below, and our team will reach out to provide personalised guidance!
Name
Select Your Inquiry

cost estimator newsletter

Subscribe to our newsletter

📣 Need an Estimate Fast? Get Yours in 24 Hours!

X
cost estimator

Builders' Estimating Service

Construction Professionals

Get Your Free
Cash Flow Forecasting Template

Your template will be emailed to you