Author name: James Hill

Building Cost Estimator UK

A dependable Building Cost Estimator UK turns your drawings into a measured cost plan: you input scope and area, it applies RICS NRM rules, benchmarks and live quotes, then adds prelims, overhead and profit, fees, inflation and contingency so you can budget with confidence. If you’re budgeting for a UK extension, loft or new build,

Building Cost Estimator UK Read More »

estimating building costs

From Blueprints to Budgets: How to Estimate Building Costs

To estimate building costs correctly, fix scope from drawings, choose the right method for your RIBA stage (order-of-cost, elemental, unit-rate or analytical), measure to RICS NRM, benchmark, then add prelims, overhead and profit, risk, fees and inflation with all assumptions stated. This is an educational guide for small builders and trades on how to estimate

From Blueprints to Budgets: How to Estimate Building Costs Read More »

Tender vs Bid in Construction: Key Differences

A tender is the formal process and documentation requesting prices and method statements, while a bid is your priced offer submitted in response to that tender. In UK construction, clients issue a tender (RFP/ITT) and contractors submit a bid that is evaluated on price and quality. Typical SME bid-preparation costs run £500 to £4,000 per

Tender vs Bid in Construction: Key Differences Read More »

Building Cost Calculator

Use this Building Cost Calculator UK guide to price typical home projects quickly, with clear assumptions, per m² rates, and example allowances you can copy into your brief. For a standard single storey rear extension in England at Q4 2025, most homeowners budget £2,000 to £3,000 per m² incl VAT for a complete build, excluding

Building Cost Calculator Read More »

📣 Need an Estimate Fast? Get Yours in 24 Hours!

X

Get Your Free
Cash Flow Forecasting Template

Your template will be emailed to you